Despite fire at Tenke Fungurume Mining, CMOC maintains timetable for start-up of new plant
This unit will increase the Congolese mine’s capacity by 200,000 tonnes of copper and 17,000 tonnes of cobalt per year.
07/09/2023 at 15h02, by Africa Business+
Recommended articles
Advisory
25/10/2023 at 16h34, by Africa Business+
Saudi Consult beats heavyweights Egis and Dar Al-Handasah for Dakar–Saint-Louis Highway
Following an open international call for tenders, an Arab-African consortium has won the contract to...
News
29/08/2023 at 11h12, by Africa Business+
DR Congo : CMOC poised to outperform Glencore on the back of Kisanfu production copper-cobalt launch
In recent months, in parallel with negotiations aimed at settling its dispute with Kinshasa over the...
Mines
12/11/2020 at 08h18, by Pierre-Olivier Rouaud
China Moly capitalises on its increased share in Tenke Fungurume Mining
Against a backdrop of recovering red metal prices, Tenke Fungurume Mining (TFM), the country’s largest...