Abidjan: Institut Pasteur contractors excluded from Ivorian tenders for two years
Having failed to deliver the complex on time, the French trio has been severely sanctioned by the local authorities. At least one of the companies in the consortium is contesting the decision and has started a conciliation procedure.
07/03/2023 at 18h59, by Africa Business+
Climascience and its compatriots Ataub Architects and Beming have been excluded from the contract to build the Centre for the Study of High Infectious Risk Pathogens (Cepris) for the Institut Pasteur de Côte d’Ivoire.
Recommended articles
Development Bank
19/12/2023 at 19h36, by Pierre-Olivier Rouaud
Institut Pasteur de Dakar: IFC provides key support for Diamniadio vaccination facility
Two and a half years after it was launched, the $250 million Dakar vaccine factory with a continental...
Health
04/03/2023 at 16h32, by Africa Business+
Health: USA support strengthens Helium Health’s loan offer
Initially specialising in providing software for healthcare institutions, the Nigerian start-up is diversifying...
Private Equity
08/12/2022 at 19h09, by Africa Business+
Healthcare: TPG Capital strengthens and restructures African assets
Through its company, Evercare, the investment giant is looking to clean up its portfolio before equipping...
Health
14/06/2022 at 15h55, by Africa Business+
Côte d’Ivoire: Tunisian pharmaceutical laboratory SAIPH to open new factory
The 30-year-old company is controlled by the Arab Company for Drug Industries and Medical Appliances...
Health
30/11/2021 at 16h13, by Africa Business+
Tunisia: Arab League fund pumps €28 million into saving Siphat laboratory
The Arab Fund for Economic and Social Development (AEDF), whose members are the countries of the Arab...